Last week I shared the problem. This is the answer.
500+ people read that post. More than half opened the demo. The question I kept getting was: what exactly does it do?
So here it is — the WorkClear System Overview. Six pages. No padding.
→ Slide 2: Why EPC projects fail — and it's not poor planning
→ Slide 3: What WorkClear actually is — an execution layer, not another planning tool
→ Slide 4: How the constraint model works — materials, drawings, predecessors
→ Slide 5: Who uses it and what each role gets
→ Slide 6: What a pilot looks like and what it costs to find out
Built by people who've been on these projects. The terminology is deliberate.